TPS61291EVM-569 Datasheet

TPS61291EVM-569

Datasheet specifications

Datasheet's name TPS61291EVM-569
File size 377.039 KB
File type pdf
Number of pages 11

Download Datasheet TPS61291EVM-569

Download Datasheet

Other documentations

Technical specifications

  • Regulator Topology: Boost
  • Current - Output: 200mA
  • Main Purpose: DC/DC, Step Up
  • Utilized IC / Part: TPS61291
  • Base Part Number: TPS612
  • Outputs and Type: 1, Non-Isolated
  • Supplied Contents: Board(s)
  • Frequency - Switching: -
  • Voltage - Output: 2.5V, 3V or 3.3V
  • Series: -
  • Voltage - Input: 0.9V ~ 5V
  • Board Type: Fully Populated
  • Part Status: Active
  • Manufacturer: Texas Instruments
  • detail: TPS61291 - DC/DC, Step Up 1, Non-Isolated Outputs Evaluation Board

Similar products